Quality lab: Briarwick Point Testing Labs
Quality lab · Greenville, SC
Bastian Garroway manages quality at Briarwick Point Testing Labs, an incoming inspection lab in Greenville, and uses this to see every customer lot through the lab on schedule, with each project counting its own steps, hours and open findings.
ManufacturingProjectsLinked tables5 tables · 6 views · 1 form · 2 dimension sets · 1 dashboard · 1 document · 1 notification · 1 stage rule set · 1 agent
Use this templateProject board
Inspection projectsEngine mount castings lot 8851
Hose end fittings lot 4561
Lag screws lot 9944
Anchor bolts lot 9931
Mechanical seal faces lot 3360
Surgical clamp blanks lot 2310
Rotor laminations lot 5590
Pump shaft forgings lot 3341
Catheter hub moldings lot 2291
Control boards lot 5561
Landing bracket castings lot 8830
Hydraulic couplings lot 4533
Motor end bells lot 5530
Turbine housing casting lot 8814
Seal kits lot 4502
Stainless socket screws lot 9917
Hydraulic fittings lot 4471
Grade 8 hex bolts lot 9902
Impeller castings lot 3318
Bone screw blanks lot 2260
Ball valve bodies lot 7741
Tables
Inspection projects
22 sample rows · 21 columnsOne incoming lot from kickoff to handoff: what was sent, the plan, who leads it, and where it stands.
| Project | Project number | Customer | Part family | Inspection plan | Stage | Kickoff |
|---|---|---|---|---|---|---|
| Bronze elbows lot 1185 | BP-26-106 | Halvard Bend Marine Fittings | Aug 10, 2026 | |||
| Hydraulic fittings lot 4471 | BP-26-101 | Tallowmere Hydraulics, Inc. | Aug 24, 2026 | |||
| Grade 8 hex bolts lot 9902 | BP-26-102 | Ferrowick Fastener Supply | Aug 28, 2026 | |||
| Impeller castings lot 3318 | BP-26-103 | Quillon Gate Pump Works | Sep 2, 2026 | |||
| Bone screw blanks lot 2260 | BP-26-104 | Sorrel Lane Medical Devices | Sep 9, 2026 | |||
| Ball valve bodies lot 7741 | BP-26-105 | Osgood Run Valve Company | Sep 14, 2026 | |||
| Motor end bells lot 5530 | BP-26-107 | Pinecroft Electric Motors | Oct 7, 2026 | |||
| Seal kits lot 4502 | BP-26-109 | Tallowmere Hydraulics, Inc. | Oct 15, 2026 | |||
| Turbine housing casting lot 8814 | BP-26-108 | Daggett Ridge Aerospace Castings | Oct 9, 2026 | |||
| Stainless socket screws lot 9917 | BP-26-110 | Ferrowick Fastener Supply | Oct 13, 2026 | |||
| Control boards lot 5561 | BP-26-113 | Pinecroft Electric Motors | Oct 29, 2026 | |||
| Hydraulic couplings lot 4533 | BP-26-115 | Tallowmere Hydraulics, Inc. | Nov 4, 2026 |
Customers
8 sample rows · 11 columnsThe manufacturers who send their incoming parts to the lab, with who to call and what is in flight for each.
| Customer | Customer code | Industry | Quality contact | Contact phone | Contact email | Account status |
|---|---|---|---|---|---|---|
| Daggett Ridge Aerospace Castings | C-204 | Lorcan Beaumont-Pike | (864) 555-0134 | lorcan.beaumont@daggettridgecastings.com | ||
| Ferrowick Fastener Supply | C-203 | Marisol Adeyemi-Cole | (864) 555-0133 | marisol.adeyemicole@ferrowickfasteners.com | ||
| Halvard Bend Marine Fittings | C-208 | Anselm Kourakis | (864) 555-0138 | anselm.kourakis@halvardbendmarine.com | ||
| Osgood Run Valve Company | C-207 | Philippa Drummond-Nash | (864) 555-0137 | philippa.drummond@osgoodrunvalve.com | ||
| Pinecroft Electric Motors | C-206 | Hendrik Solomon-Ito | (864) 555-0136 | hendrik.solomon@pinecroftmotors.com | ||
| Quillon Gate Pump Works | C-202 | Obadiah Renner | (864) 555-0132 | obadiah.renner@quillongatepumps.com | ||
| Sorrel Lane Medical Devices | C-205 | Cassiopeia Oduya-Ferreira | (864) 555-0135 | cassiopeia.oduya@sorrellanemedical.com | ||
| Tallowmere Hydraulics, Inc. | C-201 | Isadora Venkataraman | (864) 555-0131 | isadora.venkataraman@tallowmerehydraulics.com |
Steps
50 sample rows · 9 columnsThe steps of one inspection — receiving, sampling, measuring, testing, the report and the handoff — each with an owner and a due date.
| Step | Step number | Project | Kind of step | Status | Owner | Due |
|---|---|---|---|---|---|---|
| Bronze elbows: dimensional check | TK-311 | Bronze elbows lot 1185 | Teodor Maxwell-Reyes | Aug 20, 2026 | ||
| Hydraulic fittings: dimensional check | TK-301 | Hydraulic fittings lot 4471 | Teodor Maxwell-Reyes | Sep 3, 2026 | ||
| Bronze elbows: customer handoff | TK-312 | Bronze elbows lot 1185 | Bastian Garroway | Sep 8, 2026 | ||
| Grade 8 hex bolts: material test | TK-303 | Grade 8 hex bolts lot 9902 | Ines Halloran-Vu | Sep 9, 2026 | ||
| Impeller castings: material test | TK-305 | Impeller castings lot 3318 | Ines Halloran-Vu | Sep 14, 2026 | ||
| Bone screw blanks: dimensional check | TK-307 | Bone screw blanks lot 2260 | Teodor Maxwell-Reyes | Sep 21, 2026 | ||
| Hydraulic fittings: customer handoff | TK-302 | Hydraulic fittings lot 4471 | Bastian Garroway | Sep 22, 2026 | ||
| Grade 8 hex bolts: customer handoff | TK-304 | Grade 8 hex bolts lot 9902 | Bastian Garroway | Sep 24, 2026 | ||
| Ball valve bodies: dimensional check | TK-309 | Ball valve bodies lot 7741 | Teodor Maxwell-Reyes | Sep 24, 2026 | ||
| Impeller castings: customer handoff | TK-306 | Impeller castings lot 3318 | Bastian Garroway | Oct 2, 2026 | ||
| Bone screw blanks: customer handoff | TK-308 | Bone screw blanks lot 2260 | Bastian Garroway | Oct 12, 2026 | ||
| Ball valve bodies: customer handoff | TK-310 | Ball valve bodies lot 7741 | Bastian Garroway | Oct 14, 2026 |
Findings
13 sample rows · 9 columnsAnything that did not meet the plan, who decided what to do about it, and whether it is still open.
| Finding | Finding number | Project | Severity | Status | Disposition | Found |
|---|---|---|---|---|---|---|
| Grain size outside the certificate | NC-507 | Turbine housing casting lot 8814 | — | Nov 5, 2026 | ||
| Chemistry certificate does not match heat number | NC-509 | Pump shaft forgings lot 3341 | — | Nov 9, 2026 | ||
| Solder bridge on two boards | NC-510 | Control boards lot 5561 | — | Nov 10, 2026 | ||
| Tensile specimen cut waiting on customer drawing | NC-511 | Landing bracket castings lot 8830 | — | Nov 12, 2026 |
Also included
- Project board
- Step coming dueWarns the owner two days before a step is due.
- Handoff letterThe cover letter that goes out with a signed inspection report.
Questions
- What is included in the Quality lab: Briarwick Point Testing Labs template?
- 4 tables (Inspection projects, Customers, Steps and Findings), filled with 93 sample rows so every view opens with realistic data.
- Is the Quality lab: Briarwick Point Testing Labs template free?
- Yes. Sign up free, press Use this template, and a full copy is added to your workspace.
- Can I change the template after I use it?
- Yes. Every page, table, column and view in your copy is yours to rename, edit or delete, and the sample rows can be cleared.
Related templates
- Furniture workshopThistledown Crossing Woodworks4 tables · 5 views · 1 form · 1 dashboard · 1 digest · 1 notification · 1 agent
- Metal fabrication shopNettlefield Creek Fabrication3 tables · 4 views · 1 form · 1 dimension set · 1 dashboard · 1 digest · 1 notification · 1 agent
- Small Manufacturer Production DeskRedwater Woodworks7 tables · 29 views · 1 form · 11 row actions · 1 agent
- Third-party warehouseBirchcombe Grove Logistics4 tables · 8 views · 1 form · 3 dimension sets · 1 dashboard · 1 digest · 1 stage rule set · 1 agent
- Trucking Fleet DeskPlainsline Freight6 tables · 32 views · 1 form · 12 row actions · 1 agent
- Warehouse Operations DeskMid-South Fulfillment Center7 tables · 43 views · 1 form · 20 row actions · 1 agent