Drywall contractor: Kingsweir Landing Drywall
Drywall contractor · Tacoma, WA
Orla Paddington is the foreman at Kingsweir Landing Drywall, a drywall hanging and finishing contractor in Tacoma, and she keeps every licence, safety walk, dust check and finish inspection here so she can hand an inspector or a builder the proof in a minute.
Construction and tradesComplianceChecklists5 tables · 6 views · 1 form · 1 digest · 1 checklist · 1 notification · 1 stage rule set · 1 agent
Use this templateAll checks
Checks| Check | Check type | Job site | Done on | Checked by | Result | Items looked at |
|---|---|---|---|---|---|---|
| CK-26-130 | Compound batch and room temperature log | Alder Ferry townhomes, units 4 to 9 | Nov 17, 2026 | Tavish Brannigan-Oduya | 8 | |
| CK-26-129 | Site safety walk | Alder Ferry townhomes, units 4 to 9 | Nov 15, 2026 | Ximena Rothwell-Pak | 25 | |
| CK-26-128 | Low-angle light check of the finish | Alder Ferry townhomes, units 4 to 9 | Nov 13, 2026 | Tavish Brannigan-Oduya | 14 | |
| CK-26-127 | Dust containment and HEPA vacuum check | Alder Ferry townhomes, units 4 to 9 | Nov 11, 2026 | Ximena Rothwell-Pak | 20 | |
| CK-26-126 | Site safety walk | Honeywick Circle kitchen and addition | Nov 9, 2026 | Ximena Rothwell-Pak | 23 | |
| CK-26-121 | Lead-safe work practices check | Honeywick Circle kitchen and addition | Nov 8, 2026 | Ximena Rothwell-Pak | 14 | |
| CK-26-125 | Respirator fit and filter log | — | Nov 5, 2026 | Ximena Rothwell-Pak | 9 | |
| CK-26-124 | Dust containment and HEPA vacuum check | Northgate senior apartments, building B | Nov 4, 2026 | Ximena Rothwell-Pak | 20 | |
| CK-26-123 | Scaffold and stilt inspection | Northgate senior apartments, building B | Nov 2, 2026 | Lorcan Abernathy-Singh | 16 | |
| CK-26-122 | Low-angle light check of the finish | Marlowe Park dental office fit-out | Oct 31, 2026 | Tavish Brannigan-Oduya | 16 | |
| CK-26-120 | Site safety walk | Alder Ferry townhomes, units 4 to 9 | Oct 25, 2026 | Ximena Rothwell-Pak | 24 | |
| CK-26-119 | Compound batch and room temperature log | Northgate senior apartments, building B | Oct 23, 2026 | Tavish Brannigan-Oduya | 8 |
Tables
Checks
30 sample rows · 13 columnsEvery safety, dust, finish and equipment check the crew has run, what it found and what the fix costs.
| Check | Check type | Job site | Done on | Checked by | Result | Items looked at |
|---|---|---|---|---|---|---|
| CK-26-130 | Compound batch and room temperature log | Alder Ferry townhomes, units 4 to 9 | Nov 17, 2026 | Tavish Brannigan-Oduya | 8 | |
| CK-26-129 | Site safety walk | Alder Ferry townhomes, units 4 to 9 | Nov 15, 2026 | Ximena Rothwell-Pak | 25 | |
| CK-26-128 | Low-angle light check of the finish | Alder Ferry townhomes, units 4 to 9 | Nov 13, 2026 | Tavish Brannigan-Oduya | 14 | |
| CK-26-127 | Dust containment and HEPA vacuum check | Alder Ferry townhomes, units 4 to 9 | Nov 11, 2026 | Ximena Rothwell-Pak | 20 | |
| CK-26-126 | Site safety walk | Honeywick Circle kitchen and addition | Nov 9, 2026 | Ximena Rothwell-Pak | 23 | |
| CK-26-121 | Lead-safe work practices check | Honeywick Circle kitchen and addition | Nov 8, 2026 | Ximena Rothwell-Pak | 14 | |
| CK-26-125 | Respirator fit and filter log | — | Nov 5, 2026 | Ximena Rothwell-Pak | 9 | |
| CK-26-124 | Dust containment and HEPA vacuum check | Northgate senior apartments, building B | Nov 4, 2026 | Ximena Rothwell-Pak | 20 | |
| CK-26-123 | Scaffold and stilt inspection | Northgate senior apartments, building B | Nov 2, 2026 | Lorcan Abernathy-Singh | 16 | |
| CK-26-122 | Low-angle light check of the finish | Marlowe Park dental office fit-out | Oct 31, 2026 | Tavish Brannigan-Oduya | 16 | |
| CK-26-120 | Site safety walk | Alder Ferry townhomes, units 4 to 9 | Oct 25, 2026 | Ximena Rothwell-Pak | 24 | |
| CK-26-119 | Compound batch and room temperature log | Northgate senior apartments, building B | Oct 23, 2026 | Tavish Brannigan-Oduya | 8 |
Check types
8 sample rows · 6 columnsThe recurring checks an inspector or a builder expects to see, and how many days may pass between them.
| Check type | Code | Area | Days between | Checks done |
|---|---|---|---|---|
| Site safety walk | CT-101 | 7 | CK-26-101, CK-26-104, CK-26-112, CK-26-116, CK-26-120, CK-26-126, CK-26-129 | |
| Scaffold and stilt inspection | CT-102 | 14 | CK-26-106, CK-26-110, CK-26-123 | |
| Dust containment and HEPA vacuum check | CT-103 | 7 | CK-26-103, CK-26-109, CK-26-114, CK-26-118, CK-26-124, CK-26-127 | |
| Respirator fit and filter log | CT-104 | 30 | CK-26-113, CK-26-125 | |
| Low-angle light check of the finish | CT-105 | 10 | CK-26-105, CK-26-111, CK-26-115, CK-26-122, CK-26-128 | |
| Compound batch and room temperature log | CT-106 | 14 | CK-26-108, CK-26-119, CK-26-130 | |
| Lead-safe work practices check | CT-107 | 30 | CK-26-107, CK-26-121 | |
| Truck, hoist and tool inspection | CT-108 | 30 | CK-26-102, CK-26-117 |
Licences and cards
10 sample rows · 8 columnsEvery licence, policy and training card the company must show on request, who holds it and the day it runs out.
| Licence or card | Number | Held by | Issued by | Issued | Runs out | Cost to renew |
|---|---|---|---|---|---|---|
| First aid and CPR card | LC-26-109 | Lorcan Abernathy-Singh | Community safety training center | Nov 8, 2024 | Oct 29, 2026 | $95 |
| City of Tacoma business license | LC-26-104 | — | City of Tacoma licensing office | Dec 23, 2025 | Dec 23, 2026 | $110 |
| Washington contractor registration | LC-26-101 | — | State labor and industries contractor program | Jan 22, 2026 | Jan 22, 2027 | $113 |
| Aerial lift operator card | LC-26-110 | Tavish Brannigan-Oduya | Regional construction safety council | Mar 28, 2025 | Mar 28, 2027 | $150 |
| General liability insurance policy | LC-26-102 | — | Pinecrest Mutual Insurance | May 2, 2026 | May 2, 2027 | $5,400 |
| Workers compensation account | LC-26-103 | — | State workers compensation fund | Aug 20, 2026 | Aug 20, 2027 | $8,750 |
| Lead-safe renovator certificate | LC-26-105 | Orla Paddington | Approved EPA training provider | Jan 18, 2023 | Oct 14, 2027 | $275 |
| Respirable silica competent person course | LC-26-106 | Ximena Rothwell-Pak | Regional construction safety council | Jul 6, 2025 | Apr 1, 2028 | $420 |
| Ten-hour construction safety card | LC-26-108 | Ingeborg Maddox-Nwosu | Federal safety outreach trainer | Mar 13, 2026 | Dec 27, 2030 | $89 |
| Ten-hour construction safety card | LC-26-107 | Renzo Calloway-Dube | Federal safety outreach trainer | Jun 1, 2024 | Jul 15, 2031 | $89 |
Job sites
7 sample rows · 10 columnsThe jobs the crew is on and the day the quality binder is ready for the final walk.
| Job site | Builder | City | Stage | Start day | Handover day | Quality binder ready on |
|---|---|---|---|---|---|---|
| Alder Ferry townhomes, units 4 to 9 | Cobblestone Custom Homes | Tacoma | Oct 4, 2026 | Dec 9, 2026 | — | |
| Marlowe Park dental office fit-out | Ridgepoint Commercial Interiors | Puyallup | Sep 19, 2026 | Nov 24, 2026 | Nov 15, 2026 | |
| Honeywick Circle kitchen and addition | Tallow and Slate Builders | Tacoma | Nov 6, 2026 | Dec 23, 2026 | — | |
| Northgate senior apartments, building B | Brightfield Development | Lakewood | Sep 29, 2026 | Dec 16, 2026 | — | |
| Wrenfield school library renovation | Larkhaven Construction Group | University Place | Jul 31, 2026 | Nov 9, 2026 | Nov 6, 2026 | |
| Quillgate bakery tenant improvement | Ridgepoint Commercial Interiors | Fife | Aug 25, 2026 | Oct 27, 2026 | Oct 24, 2026 | |
| Thistledown Row duplex | Cobblestone Custom Homes | Gig Harbor | Dec 2, 2026 | Jan 27, 2027 | — |
Also included
- Before the final walk
- Job site board
- Licence running outWarns the office six weeks before a licence, policy or card lapses.
- Monday failed checks
Questions
- What is included in the Drywall contractor: Kingsweir Landing Drywall template?
- 4 tables (Checks, Check types, Licences and cards and Job sites), filled with 55 sample rows so every view opens with realistic data.
- Is the Drywall contractor: Kingsweir Landing Drywall template free?
- Yes. Sign up free, press Use this template, and a full copy is added to your workspace.
- Can I change the template after I use it?
- Yes. Every page, table, column and view in your copy is yours to rename, edit or delete, and the sample rows can be cleared.
Related templates
- Deck builderAmberly Hill Decks3 tables · 4 views · 1 form · 2 dimension sets · 1 dashboard · 1 drill-down · 1 digest · 1 notification · 1 agent
- Electrical contractorWesterly Green Electric4 tables · 5 views · 1 form · 3 dimension sets · 1 dashboard · 1 drill-down · 1 digest · 1 agent
- Landscaping companyAmberly Ridge Landscapes5 tables · 8 views · 2 forms · 2 dimension sets · 1 dashboard · 1 digest · 2 documents · 1 notification · 2 stage rule sets · 1 row action · 1 agent
- Roofing contractorMillbrae Green Roofing4 tables · 6 views · 1 form · 1 dimension set · 1 dashboard · 1 digest · 1 notification · 1 stage rule set · 1 agent
- Window and door installerAshcombe Landing Windows & Doors3 tables · 5 views · 1 form · 2 dimension sets · 1 dashboard · 1 drill-down · 1 digest · 1 notification · 1 agent
- Cabinet makerOrchardine Station Cabinetry4 tables · 5 views · 1 form · 2 dimension sets · 1 booking page · 1 dashboard · 1 notification · 1 stage rule set · 1 row action · 1 agent