General Contractor Projects
General contractors, remodelers and project managers
For builders and remodelers: jobs, subs, permits, change orders, punch lists and closeout.
General Contractor Projects
Start here
Dashboard
Starting a job
Change order discipline
Subcontractor onboarding and insurance
Punch list and closeout
At a glance
| Job | Client | Site address | Contract type | Permit number | Permit | Status |
|---|---|---|---|---|---|---|
| Dellacroix kitchen and addition | Marcel Dellacroix | 41 Birchwood Terrace | BLD-24-03318 | In progress | ||
| Ashgrove basement finish | Ophelia Ashgrove | 9 Quarry Road | BLD-24-02741 | Punch list | ||
| Tanaka-Wells roof replacement | Hiroshi Tanaka-Wells | 220 Aspen Ridge | ROOF-24-0912 | Contract signed | ||
| Mbeki bathroom remodel | Folasade Mbeki | 17 Harrow Street | BLD-24-03460 | In progress | ||
| Ingram garage to studio conversion | Barnaby Ingram | 63 Millbrook Lane | — | Estimating | ||
| Petrov deck and pergola | Anya Petrov | 5 Larkspur Way | BLD-23-11872 | Complete | ||
| Lindgren whole-home exterior repaint | Sigrid Lindgren | 88 Cedar Hollow | — | On hold |
| Job | Client | Site address | Contract type | Permit number | Permit | Status |
|---|---|---|---|---|---|---|
| Dellacroix kitchen and addition | Marcel Dellacroix | 41 Birchwood Terrace | BLD-24-03318 | In progress | ||
| Ashgrove basement finish | Ophelia Ashgrove | 9 Quarry Road | BLD-24-02741 | Punch list | ||
| Tanaka-Wells roof replacement | Hiroshi Tanaka-Wells | 220 Aspen Ridge | ROOF-24-0912 | Contract signed | ||
| Mbeki bathroom remodel | Folasade Mbeki | 17 Harrow Street | BLD-24-03460 | In progress | ||
| Ingram garage to studio conversion | Barnaby Ingram | 63 Millbrook Lane | — | Estimating | ||
| Petrov deck and pergola | Anya Petrov | 5 Larkspur Way | BLD-23-11872 | Complete | ||
| Lindgren whole-home exterior repaint | Sigrid Lindgren | 88 Cedar Hollow | — | On hold |
| Phase | Project | Subcontractor | Starts | Ends | Completed on | Status |
|---|---|---|---|---|---|---|
| Rough electrical, Dellacroix addition | Dellacroix kitchen and addition | Kestrel Electric | Nov 16, 2026 | Nov 22, 2026 | — | In progress |
| Framing the Dellacroix addition | Dellacroix kitchen and addition | Ridgeline Framing | Oct 19, 2026 | Nov 15, 2026 | Nov 15, 2026 | Done |
| Plumbing rough-in, Dellacroix kitchen | Dellacroix kitchen and addition | Pellam Plumbing | Nov 18, 2026 | Nov 19, 2026 | — | Not started |
| Hang and finish drywall, Dellacroix | Dellacroix kitchen and addition | Smoothline Drywall | Dec 2, 2026 | Dec 13, 2026 | — | Not started |
| Final paint, Ashgrove basement | Ashgrove basement finish | Brightcoat Painting | Nov 13, 2026 | Nov 21, 2026 | — | In progress |
| Shower and floor tile, Mbeki bath | Mbeki bathroom remodel | Mosaic Tile Works | Nov 18, 2026 | Nov 27, 2026 | — | Not started |
| Demolition, Mbeki bath | Mbeki bathroom remodel | Ridgeline Framing | Oct 31, 2026 | Nov 6, 2026 | Nov 6, 2026 | Done |
| Supply and drain lines, Mbeki bath | Mbeki bathroom remodel | Pellam Plumbing | Nov 8, 2026 | Nov 16, 2026 | — | Delayed |
Projects
| Job | Client | Site address | Contract type | Permit number | Permit | Status |
|---|---|---|---|---|---|---|
| Dellacroix kitchen and addition | Marcel Dellacroix | 41 Birchwood Terrace | BLD-24-03318 | In progress | ||
| Ashgrove basement finish | Ophelia Ashgrove | 9 Quarry Road | BLD-24-02741 | Punch list | ||
| Tanaka-Wells roof replacement | Hiroshi Tanaka-Wells | 220 Aspen Ridge | ROOF-24-0912 | Contract signed | ||
| Mbeki bathroom remodel | Folasade Mbeki | 17 Harrow Street | BLD-24-03460 | In progress | ||
| Ingram garage to studio conversion | Barnaby Ingram | 63 Millbrook Lane | — | Estimating | ||
| Petrov deck and pergola | Anya Petrov | 5 Larkspur Way | BLD-23-11872 | Complete | ||
| Lindgren whole-home exterior repaint | Sigrid Lindgren | 88 Cedar Hollow | — | On hold |
Phases
| Phase | Project | Subcontractor | Starts | Ends | Completed on | Status |
|---|---|---|---|---|---|---|
| Rough electrical, Dellacroix addition | Dellacroix kitchen and addition | Kestrel Electric | Nov 16, 2026 | Nov 22, 2026 | — | In progress |
| Framing the Dellacroix addition | Dellacroix kitchen and addition | Ridgeline Framing | Oct 19, 2026 | Nov 15, 2026 | Nov 15, 2026 | Done |
| Plumbing rough-in, Dellacroix kitchen | Dellacroix kitchen and addition | Pellam Plumbing | Nov 18, 2026 | Nov 19, 2026 | — | Not started |
| Hang and finish drywall, Dellacroix | Dellacroix kitchen and addition | Smoothline Drywall | Dec 2, 2026 | Dec 13, 2026 | — | Not started |
| Final paint, Ashgrove basement | Ashgrove basement finish | Brightcoat Painting | Nov 13, 2026 | Nov 21, 2026 | — | In progress |
| Shower and floor tile, Mbeki bath | Mbeki bathroom remodel | Mosaic Tile Works | Nov 18, 2026 | Nov 27, 2026 | — | Not started |
| Demolition, Mbeki bath | Mbeki bathroom remodel | Ridgeline Framing | Oct 31, 2026 | Nov 6, 2026 | Nov 6, 2026 | Done |
| Supply and drain lines, Mbeki bath | Mbeki bathroom remodel | Pellam Plumbing | Nov 8, 2026 | Nov 16, 2026 | — | Delayed |
Change orders
| Change order | Project | Reason | Amount | Days added to schedule | Requested | Decision needed by |
|---|---|---|---|---|---|---|
| CO 4: quartz countertops in place of laminate | Dellacroix kitchen and addition | $4,800 | 3 | Nov 12, 2026 | Nov 19, 2026 | |
| CO 3: six recessed lights in the family room | Dellacroix kitchen and addition | $2,300 | 1 | Oct 24, 2026 | Oct 29, 2026 | |
| CO 2: egress window in the basement bedroom | Ashgrove basement finish | $3,100 | 4 | Oct 9, 2026 | Oct 14, 2026 | |
| CO 2: heated floor under the bath tile | Mbeki bathroom remodel | $1,650 | 2 | Nov 10, 2026 | Nov 19, 2026 | |
| CO 3: rework drain slope found behind the wall | Mbeki bathroom remodel | $1,200 | 3 | Nov 13, 2026 | Nov 16, 2026 | |
| CO 1: low-voltage pergola lighting | Petrov deck and pergola | $900 | 1 | Jul 11, 2026 | Jul 16, 2026 | |
| CO 3: skylight over the basement stair | Ashgrove basement finish | $2,750 | 6 | Sep 19, 2026 | Sep 24, 2026 |
Punch items
| Punch item | Project | Location | Responsible subcontractor | Due | Fixed on | Verified on |
|---|---|---|---|---|---|---|
| Touch up scuffed baseboard by the bar | Ashgrove basement finish | Basement hallway | Brightcoat Painting | Nov 18, 2026 | — | — |
| Re-caulk shower surround | Ashgrove basement finish | Basement bath | Mosaic Tile Works | Nov 17, 2026 | — | — |
| Adjust cabinet door alignment | Ashgrove basement finish | Basement bar | Ridgeline Framing | Nov 19, 2026 | — | — |
| Replace cracked outlet cover in the hall | Ashgrove basement finish | Rec room | Kestrel Electric | Nov 15, 2026 | Nov 15, 2026 | — |
| Fill nail pops in ceiling | Ashgrove basement finish | Rec room | Smoothline Drywall | Nov 12, 2026 | — | Nov 12, 2026 |
| Seal the new deck boards | Petrov deck and pergola | Back deck | Brightcoat Painting | Jul 31, 2026 | — | Jul 31, 2026 |
| Plumb and shim the corner pergola post | Petrov deck and pergola | Back deck | Ridgeline Framing | Jul 29, 2026 | — | Jul 29, 2026 |
Subcontractors
| Subcontractor | Trade | License number | Contact | Phone | Insurance expires | |
|---|---|---|---|---|---|---|
| Kestrel Electric | EC-40217 | Lorenzo Baptiste | (406) 555-0131 | office@kestrelelectric.net | Apr 7, 2027 | |
| Pellam Plumbing | PL-11835 | Odalys Fenwick | (406) 555-0132 | dispatch@pellamplumbing.net | Dec 10, 2026 | |
| Ridgeline Framing | GC-77102 | Tobias Akinola | (406) 555-0133 | tobias@ridgelineframing.net | Jun 16, 2027 | |
| Highcrest Roofing | RF-30954 | Marguerite Odum | (406) 555-0134 | bids@highcrestroofing.net | Nov 10, 2026 | |
| Smoothline Drywall | DW-58810 | Bartholomew Nkemelu | (406) 555-0135 | crew@smoothlinedrywall.net | Feb 21, 2027 | |
| Mosaic Tile Works | TL-26641 | Ingrid Solano | (406) 555-0136 | ingrid@mosaictileworks.net | Nov 20, 2026 | |
| Brightcoat Painting | PT-90413 | Cormac Whitlock | (406) 555-0137 | estimates@brightcoatpainting.net | Sep 14, 2027 | |
| Alpine Heating and Air | ME-62250 | Yetunde Bassey | (406) 555-0138 | service@alpineheatair.net | Jan 17, 2027 |
The five lists
The money columns
Your first week
The weekly rhythm
Example
The Mbeki bath is cost plus. The plumber found a drain with the wrong slope behind the wall, so a change order for the rework went to the owner with three days added. The supply and drain phase failed inspection and shows Delayed until the change is signed and the fix is re-inspected.
| Job | Client | Site address | Contract type | Permit number | Permit | Status |
|---|---|---|---|---|---|---|
| Dellacroix kitchen and addition | Marcel Dellacroix | 41 Birchwood Terrace | BLD-24-03318 | In progress | ||
| Ashgrove basement finish | Ophelia Ashgrove | 9 Quarry Road | BLD-24-02741 | Punch list | ||
| Tanaka-Wells roof replacement | Hiroshi Tanaka-Wells | 220 Aspen Ridge | ROOF-24-0912 | Contract signed |
| Job | Client | Site address | Contract type | Permit number | Permit | Status |
|---|---|---|---|---|---|---|
| Dellacroix kitchen and addition | Marcel Dellacroix | 41 Birchwood Terrace | BLD-24-03318 | In progress | ||
| Ashgrove basement finish | Ophelia Ashgrove | 9 Quarry Road | BLD-24-02741 | Punch list | ||
| Tanaka-Wells roof replacement | Hiroshi Tanaka-Wells | 220 Aspen Ridge | ROOF-24-0912 | Contract signed |
| Phase | Project | Subcontractor | Starts | Ends | Completed on | Status |
|---|---|---|---|---|---|---|
| Rough electrical, Dellacroix addition | Dellacroix kitchen and addition | Kestrel Electric | Nov 16, 2026 | Nov 22, 2026 | — | In progress |
| Framing the Dellacroix addition | Dellacroix kitchen and addition | Ridgeline Framing | Oct 19, 2026 | Nov 15, 2026 | Nov 15, 2026 | Done |
| Plumbing rough-in, Dellacroix kitchen | Dellacroix kitchen and addition | Pellam Plumbing | Nov 18, 2026 | Nov 19, 2026 | — | Not started |
| Change order | Project | Reason | Amount | Days added to schedule | Requested | Decision needed by |
|---|---|---|---|---|---|---|
| CO 4: quartz countertops in place of laminate | Dellacroix kitchen and addition | $4,800 | 3 | Nov 12, 2026 | Nov 19, 2026 | |
| CO 3: six recessed lights in the family room | Dellacroix kitchen and addition | $2,300 | 1 | Oct 24, 2026 | Oct 29, 2026 | |
| CO 2: egress window in the basement bedroom | Ashgrove basement finish | $3,100 | 4 | Oct 9, 2026 | Oct 14, 2026 |
| Punch item | Project | Location | Responsible subcontractor | Due | Fixed on | Verified on |
|---|---|---|---|---|---|---|
| Touch up scuffed baseboard by the bar | Ashgrove basement finish | Basement hallway | Brightcoat Painting | Nov 18, 2026 | — | — |
| Re-caulk shower surround | Ashgrove basement finish | Basement bath | Mosaic Tile Works | Nov 17, 2026 | — | — |
| Adjust cabinet door alignment | Ashgrove basement finish | Basement bar | Ridgeline Framing | Nov 19, 2026 | — | — |
| Subcontractor | Trade | License number | Contact | Phone | Insurance expires | |
|---|---|---|---|---|---|---|
| Kestrel Electric | EC-40217 | Lorenzo Baptiste | (406) 555-0131 | office@kestrelelectric.net | Apr 7, 2027 | |
| Pellam Plumbing | PL-11835 | Odalys Fenwick | (406) 555-0132 | dispatch@pellamplumbing.net | Dec 10, 2026 | |
| Ridgeline Framing | GC-77102 | Tobias Akinola | (406) 555-0133 | tobias@ridgelineframing.net | Jun 16, 2027 |
Change orders waiting
| Change order | Project | Reason | Amount | Days added to schedule | Requested | Decision needed by |
|---|---|---|---|---|---|---|
| CO 4: quartz countertops in place of laminate | Dellacroix kitchen and addition | $4,800 | 3 | Nov 12, 2026 | Nov 19, 2026 | |
| CO 3: six recessed lights in the family room | Dellacroix kitchen and addition | $2,300 | 1 | Oct 24, 2026 | Oct 29, 2026 | |
| CO 2: egress window in the basement bedroom | Ashgrove basement finish | $3,100 | 4 | Oct 9, 2026 | Oct 14, 2026 |
Punch items open
| Punch item | Project | Location | Responsible subcontractor | Due | Fixed on | Verified on |
|---|---|---|---|---|---|---|
| Touch up scuffed baseboard by the bar | Ashgrove basement finish | Basement hallway | Brightcoat Painting | Nov 18, 2026 | — | — |
| Re-caulk shower surround | Ashgrove basement finish | Basement bath | Mosaic Tile Works | Nov 17, 2026 | — | — |
| Adjust cabinet door alignment | Ashgrove basement finish | Basement bar | Ridgeline Framing | Nov 19, 2026 | — | — |
Before you break ground
The preconstruction meeting
Meet the owner on site with the superintendent. Cover:
Day one on site
The schedule
Build the phases in the order the trades need each other: demolition, framing, rough plumbing, rough electrical and heating, rough inspection, insulation, drywall, finishes, final inspection. Each inspection is marked on the phase that needs it. A failed inspection sets the phase to Delayed until the fix is done and re-inspected.
Example
The Tanaka-Wells roof is signed with the deposit in. The roofing permit is applied for, so the tear-off phase stays Not started and the inspection is marked To schedule. Highcrest Roofing's insurance has lapsed; they cannot be booked until a new certificate arrives.
What goes wrong
Most disputes on finished jobs come from the first week: an unclear selection, a verbal change, or a damaged floor nobody photographed. A complete start costs an hour and saves days at the end.
The rule
No changed work starts until the owner has signed the change order. Not a text, not a nod on site: a signed document with a price and the days it adds.
Writing a change order
Following up
When it is signed
When it is rejected
Mark it rejected and keep it. The record matters if the question comes up again at closeout.
Reading the numbers
Changes waiting on the owner on each project should be small and short-lived. A large number there means work is waiting or, worse, work is being done that may never be paid for.
Example
CO 4 on the Dellacroix kitchen swaps laminate for quartz at 4,800 dollars and three days. The owner has until the end of the week to decide before the fabricator's template date is lost.
Before a sub's first job
Enter the date the insurance ends in Insurance expires.
Keeping it current
The subcontractor views show insurance expiring this week, in the next 30 days, and already expired.
Lien waivers
Every time you pay a sub, collect a lien waiver for that payment. Tick Lien waivers current only when you hold one for every payment so far. An unpaid supplier of a sub can put a lien on the owner's house; waivers protect the owner and your reputation.
Standing
Scheduling a sub
Book the phase with a start and end date, then call to confirm the Monday before. Phases booked now shows how much of your work a sub is carrying; a sub booked on four jobs at once is a delay waiting to happen.
Example
Highcrest Roofing's insurance expired eight days ago. They are On hold, the Tanaka-Wells tear-off is not confirmed, and the office has asked their agent for the renewal.
Building the list
Working the list
Punch items not verified on the project counts everything still open or fixed but unchecked.
Closeout checklist
Then press Mark complete.
After the job
Book a check-in call at 30 days and at 11 months, before the one-year warranty ends. Small fixes done quickly turn owners into referrals.
Keeping the owner on side
Owners living with an unfinished house get tired. Send a short note each Friday during punch: what was finished, what is left and when each sub is coming back. A clear list with dates ends most closeout arguments before they start.
Example
The Ashgrove basement has three open items: caulk in the shower, a scuffed baseboard by the bar and a cabinet door to align. The outlet cover is fixed but not yet checked. The final paint phase finishes this week, so the closeout walk is booked for Friday.
What's inside
6 tables · 29 views · 1 form · 10 row actions · 1 agent7 pages
- General Contractor Projects
- Start here
- Dashboard
- Starting a job
- Change order discipline
- Subcontractor onboarding and insurance
- Punch list and closeout
5 tables
- Projects5 views · 7 sample rows
- Phases7 views · 10 sample rows
- Change orders6 views · 7 sample rows
- Punch items6 views · 7 sample rows
- Subcontractors5 views · 8 sample rows
Questions
- What is included in the General Contractor Projects template?
- 7 pages (General Contractor Projects, Start here, Dashboard, Starting a job, Change order discipline and 2 more) and 5 tables (Projects, Phases, Change orders, Punch items and Subcontractors), filled with 39 sample rows so every view opens with realistic data.
- Who is the General Contractor Projects template for?
- General contractors, remodelers and project managers.
- Is the General Contractor Projects template free?
- Yes. Sign up free, press Use this template, and a full copy is added to your workspace.
- Can I change the template after I use it?
- Yes. Every page, table, column and view in your copy is yours to rename, edit or delete, and the sample rows can be cleared.
Related workspaces
Coworking SpaceMembers and tours, desks and offices, meeting-room credits and front-desk tickets.
Home Inspection BusinessFor home inspectors: bookings, agreements, reports, agent referrals and license renewals.
Interior Design StudioFor interior designers: projects by phase, furnishings orders, client approvals and fees.
Mortgage Broker PipelineFor mortgage brokers: loan files by stage, rate locks, conditions, closings and partners.
Property ManagementFor landlords and property managers: units, leases, rent roll, repairs and renewals.
Real Estate BrokerageFor realtors and brokers: leads, listings, contracts, contingency dates and commissions.